Two-thirds of hot nuclear fuel remains in reactor core at Calhoun plant even though media claims it was ‘shut down’ for refueling and maintenance

 
Anonymous Coward
User ID: 1430660
United States
06/17/2011 06:35 PM
Report Abusive Post
Report Copyright Violation
Two-thirds of hot nuclear fuel remains in reactor core at Calhoun plant even though media claims it was ‘shut down’ for refueling and maintenance
Virtually every article about the flooding mentions that the Fort Calhoun plant was shut down on April 9. On May 27, the Omaha World-Herald reported, “The Omaha Public Power District said its nuclear plant at Fort Calhoun, which is shut down for maintenance, is safe from flooding.” The implication is that being shut down makes a plant safe. But as the ongoing crisis in Fukushima demonstrates, nuclear fuel remains hot long after a reactor is shut down. When Fort Calhoun is shut down for maintenance and refueling, only one-third of the fuel in the reactor core is removed.

[link to enenews.com]
Anonymous Coward (OP)
User ID: 1430660
United States
06/17/2011 06:36 PM
Report Abusive Post
Report Copyright Violation
Re: Two-thirds of hot nuclear fuel remains in reactor core at Calhoun plant even though media claims it was ‘shut down’ for refueling and maintenance
[link to www.thebulletin.org]
Anonymous Coward (OP)
User ID: 1430660
United States
06/17/2011 06:38 PM
Report Abusive Post
Report Copyright Violation
Re: Two-thirds of hot nuclear fuel remains in reactor core at Calhoun plant even though media claims it was ‘shut down’ for refueling and maintenance
*BREAKING* May 16 report foreshadowed yesterday’s “event” at Calhoun nuke plant: Flooding of Intake Structure through penetrations could jeopardize abilty to cool reactor

Facility: FORT CALHOUN
Notification Date: 06/16/2011
Notification Time: 14:46 [ET]
Event Date: 06/16/2011
Event Time: 12:30 [CDT]

Event Text: ADDITIONAL PENETRATION IDENTIFIED FOR MITIGATION DURING WALKDOWN

“Operations identified a potential flooding issue in the Intake Structure 1007 ft. 6 in. level. The area of concern is a the hole in the floor at the 1007 ft. 6 in. level where the relief valve from FP-1A discharge pipe goes through the raw pump bay and discharges into the intake cell. There is one penetration of concern. Flooding through this penetration could have impacted the ability of the station’s Raw Water (RW) pumps to perform their design accident mitigation functions.

“Efforts are in progress to seal the penetration.

“This eight-hour notification is being made pursuant to 10 CFR 50.72 (b)(3)(v).”

The licensee notified the NRC Resident Inspector.

[link to www.nrc.gov]
Anonymous Coward
User ID: 1223045
United States
06/17/2011 07:20 PM
Report Abusive Post
Report Copyright Violation
Re: Two-thirds of hot nuclear fuel remains in reactor core at Calhoun plant even though media claims it was ‘shut down’ for refueling and maintenance
Listen, I just can't take another nuclear disaster at this point. So as far as I'm concerned this isn't happening.





GLP