Godlike Productions - Discussion Forum
Users Online Now: 1,294 (Who's On?)Visitors Today: 141,305
Pageviews Today: 219,511Threads Today: 87Posts Today: 1,235
02:24 AM


Rate this Thread

Absolute BS Crap Reasonable Nice Amazing
 

SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**

 
Gardenzero
Offer Upgrade

User ID: 1212870
Canada
04/13/2011 02:56 PM
Report Abusive Post
Report Copyright Violation
SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
here is the link
[link to www.globalresearch.ca]

"Confused and often conflicting reports out of Fukushima 1 nuclear plant cannot be solely the result of tsunami-caused breakdowns, bungling or miscommunication. Inexplicable delays and half-baked explanations from Tokyo Electric Power Company (TEPCO) and the Ministry of Economy, Trade and Industry (METI) seem to be driven by some unspoken factor.

The smoke and mirrors at Fukushima 1 seem to obscure a steady purpose, an iron will and a grim task unknown to outsiders. The most logical explanation: The nuclear industry and government agencies are scrambling to prevent the discovery of atomic-bomb research facilities hidden inside Japan's civilian nuclear power plants.

A secret nuclear weapons program is a ghost in the machine, detectable only when the system of information control momentarily lapses or breaks down. A close look must be taken at the gap between the official account and unexpected events."

dead or alive
Gardenzero  (OP)

User ID: 1212870
Canada
04/13/2011 08:18 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
no takers?
TraderRob

User ID: 1339883
United States
04/13/2011 08:24 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
no takers?
 Quoting: Gardenzero


We are collectively thinking about the prospect.
Have a nice day = GFY. GFY = Go Fuck Yourself. If this offends you then have a nice day.
Anonymous Coward
User ID: 1341050
Australia
04/13/2011 08:25 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
What about the IAEA inspections?
Anonymous Coward
User ID: 1296906
United States
04/13/2011 08:28 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
I'll buy that for a dollar.
KBambi

User ID: 1294152
United States
04/13/2011 08:29 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
no takers?
 Quoting: Gardenzero


We are collectively thinking about the prospect.
 Quoting: TraderRob


bump
"We are locked in a battle. This is not a friendly, gentleman's discussion. It is a life and death conflict between the spiritual hosts of wickedness and those who claim the name of Jesus Christ."

"Search for the truth is the noblest occupation of man; its publication is a duty.”

Anne Louise Germaine de Stael (1766-1817), French author

“In times of universal deceit, telling the truth will be a revolutionary act.”

George Orwell

"I am the way, the truth, and the life."

Jesus Christ
East of Autumn

User ID: 1326492
United States
04/13/2011 08:32 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
What about the IAEA inspections?
 Quoting: Anonymous Coward 1341050


Some ones pockets got lined well for the heads up.

Not hard to hide, money.
Politics is war with out bloodshed. War is politics with bloodshed.

To stop mankind's act of war, we must eliminate the politics that initiate war.
Anonymous Coward
User ID: 1338190
Canada
04/13/2011 08:39 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
Don't worry, most of the citizens were evacuated prior to the event.
KBambi

User ID: 1294152
United States
04/13/2011 08:47 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
Tell me there isn't hidden messages in this. This is the Japanese PR's translated with Google translate from Chinese to English instead. This is just a sample. And yes its broken english because some words do not translate. Its gets even more interesting when you translate from jap and chi and put the 2 texts together.

[link to www.tepco.co.jp]

Now】 【morning 9:00

Heisei 23 years April 13
Tokyo Electric Power Co., Ltd.

Heisei 23 years March 11 発 に し Health い ま し ta ta Sanriku red を と す る focal areas of Northeast Pacific seismic impulse
Ni yo ri, when the community atomic force 発 の は じ め CLP を と し large ki ta equipment が な を killed by け る な か で,
Regional の さ site are は じ め ま を, both Hiro く さ の ま に social 変 な ご big heart with confusion を ご と し お か け
Ri て お ま す こ と に し Dui, mind yo ri apply し あ お げ surprised び します.

When the main social facilities へ の に つ い て な effect, the following の お through ri ta know ら せ い します.
※ offline Department issues new regulations ga

【Power by atomic force 発】
* Fukushima power of the first atomic force 発 Unit 1 to 3 stop in earthquake に よ ri
(4 ~ 6 in the machine wa periodic Inspection Probes)
※ 4 月 12 Afternoon 2:07 ta ha に 発 Fukushima Prefecture Hamamatsu Health し を source through ri su ru M6.3 の と の do after the earthquake
Recognized に つ い て は state the following の through ri.
• 1 ~ 6, the external power supply unit の は な し exception.
• 1 Unit 3 nuclear reactor へ の の water conditions, Unit 1 nuclear reactor へ の Wagner container enclosing condition ni Chisso
Exception が な い こ と を confirmation.
* The main パ Unit ラ の メ ー に つ い て exception タ が な い こ と を confirmation.
* After the earthquake, タ リ ニ ン の holds an instruction value グ し な は exception.
* Earthquake 発 after birth, and outside the operator に し て Dui important buildings earthquake-free retreat を へ の instructions.そ の, the operator の
Security has confirmed さ れ が こ と か ら ta afternoon 3:05 に を backoff command to lift.

※ 4 月 12 Afternoon 4:26 yo ri, 3 machine using Qi fuel プ ー ル へ の コ ク リ ー ン ン プ cars & Suites ポ
に よ る を drainage began. On the same day the end of the afternoon 5:16.

※ The date 13 years ago 0:30 yo ri, 4 machine with Ji fuel プ ー ル へ の コ ク リ ー ン ン プ cars & Suites ポ
に よ る を drainage began. On the same day the end of morning 6:57.

※ 4 月 12 Afternoon 7:35 yo ri, Li Hang, Unit 2 つ の に い て water retention of Unit 2 へ の complex water transfer device
を start.

※ 4 月 2 日 9:30 morning are No. 2, the intake unit to pay nearly ブ の ー ル を power ケ incorporated su ru Li Hang (コ
ー ン ト ク リ system) in the water が に ま っ て お ri slip, the amount of space line で 1,000 mSv / h を え て い る こ super
と, そ の の water が Li Hang Kameari cleft side (about 20cm) out of yo ri sea に し て い る こ と を confirmation. 2
Machine と の ト レ ン チ pit when the legislature に つ な が る に は ト レ ン チ が あ access the 続 ge ri, タ ー Bldg Unit 2
ン の housing water slide ma ri ga, when the access from the 続 ge are を し Jing, Li Hang Kameido crack out some か ら へ し ta to the sea
To test sexual を え, Health コ ト ー ン を ク リ established at the second pit ni ri ni wa ta ta が し into the sea water leak れ の へ の
変 に し な amount of. Sealing method for new し に い つ い て し Jian discussion, such as polymer ポ リ マ ー を し ta utilize only
Water operations を start. April 4, Li Hang か ら ー を サ & Suites レ ー し into the water flow れ の の を Mika facilities survey
Ta が し, の reduced outflow, the outflow of water の は 変 の recognized color さ れ ず.図 の チ ェ ッ ク surface, ル ー
ト う と の lines were confirmed を に, の site に confirm details of the situation を し, when the ピ ッ ト deserve ら の か え leakage
い で は な く, ピ ッ と ダ & Suites upstream pipeline の つ な の ク ト ぎ pipeline project and other か ら の に あ る Sui under the rock
(Lee の sand layer) に が high concentration of water leakage の し, そ れ ら を 伝 て っ さ れ て sea へ い る release probability
に つ い て も Jian discussion. Sui rock の か ら の water leakage and Commerce え い へ の と し て, の sites pipeline week vicinities of autologous
And Commerce Bank seal に う こ と を と し, sealing the door at home Patents の の を hand line with a total に う と, な information necessary to machine materials の
Tune into up to を め, April 5, the water department ga の ラ ス を Mika Drugs injected into the facilities. Likengzhoufan に 2 カ the point を の
レ ー け て ト open サ ー こ と を ろ into し ta, April 5 afternoon 2:15, ト レ ー が ー サ Hang Li
Week vicinities の band to band pass じ て を し て い out of the sea へ る こ と を confirmation.こ の ため, April 5 3 pm afternoon
7 points yo ri Li Hang Zhou vicinities の か ら freezing point injection Ji の を し began, April 6 hectares morning 5:38, ピ
コ ン の ッ ト side ト part ク リ か ら ー の が out only こ と を ま っ ta confirmation. Ma ta, 2 machine タ
Other Medical ン の housing に つ い て は water level rose し て い な い こ と を confirmation. On the same day, out of the ni Dui ge
し て, と ゴ Rousseau plate sealing fixture and Commerce に よ る を し Mika Shi, cited ki ki 続 whether leakage え い の を surveillance.
Party, April 5 3 yo ri afternoon, the south side of the CLP 発 の か ら Patents の with harbor water pollution prevention ぐ の を out
ため, breakwater weeks vicinities で の う の large volume of soil み み に よ る 込 を sealing fortifications began. Ma ta, Patents used in Hong Kong
Radioactive material within か ら を を with む water out of anti-ぐ の ため, at 10:45 on April 11, 発 の power of the south
Breakwater to pay nearly 120 メ ー ト ni Hikaru Hikaru の シ ン ス & Suites フ ェ (double) を setting. April 12, 2
ー ン ス ク リ machine に 鉄 front plate (1) を set, Ji 続 operations.
Li pit の お よ び near the water near the sea サ ン の プ リ facilities し ン グ を Mika, ヨ ウ factors, セ シ を Jian ム ウ out.
In the future, he そ の の に つ い て nuclides も を Mira Si lend further evaluation set. Ma ta, April 2 yo ri, Fukushima No.
First, the second power of the impulse contract 発 に お け る location 15km water サ ン ン プ リ グ も し start (April 5
Yo ri, the new ta ge wo ni 3 additional), the future, the に 総 joint assessment to be Si.

※ 4 月 1 Afternoon 3 yo ri, shared プ ー ル の mountain side of the range of about 500m2 の に Tong, ground の radioactive material
Anti ぐ の を quality flying flying try to prevent Ji を に 験 the spread. On the same day afternoon 4:05 に end. Ma ta, 4
に は 5 February 4 local east, south お よ び mountain side shared プ の ー ル に test 験 total of about 600m2 spread.
April 6 share プ ー ル に は の mountain side about 600m2, 8 日 に は about 680m2, 10 日 に は about 550m2,
11 に は about 1,200 m2, 12 of about 700m2 の 日 に は に Fan Tong's trial 験 に distribution.

* Fukushima second power of the atomic force 発 Unit 1 to 4 to stop the earthquake に よ ri
※ 4 月 12 Afternoon 2:07 students are し に 発 Fukushima Prefecture Hamamatsu pass ri ta source を と す る M6.3 earthquake に よ る の
し な は impact.

* Kashiwazaki-Kariwa power of the atomic force 発 は Unit 1,5,6,7 usually shipped in 転
(2 ~ 4 in the machine wa periodic Inspection Probes)
※ 4 月 12 Afternoon 2:07 students are し に 発 Fukushima Prefecture Hamamatsu pass ri ta source を と す る に M6.3 の よ earthquake
る し な は impact.

Fire 発】 【CLP
* Hiroshi Nakano 2,4 CLP Fire Unit 発 に よ ri stop in earthquake
* Hitachinaka fire power of the Unit 1 発 に よ ri stop in earthquake
* Kashima fire power of the No. 6 machine 発 に よ ri stop in earthquake

The hydraulic power of the】 【発
* Denki supply に つ い て の は, す べ て み Ji involution
(Ta da し, equipment damage ge に つ い て は which, in a timely Duiying)

へ の 【distribution of equipment, etc.】
* Denki supply に つ い て の は, す べ て み Ji involution
(Ta da し, equipment damage ge に つ い て は which, in a timely Duiying)

【Project power facilities と の saving principle is not Mika の お に い つ い て willing】
Northeast Pacific Ocean where earthquakes に よ ri punch atomic force 発 CLP, CLP fire 発 の が killed more を く け stop by
こ と か ら し ta, and now supply the full force に で の involution taken to ensure the group ん で お ri ri ま す が, お さ off
Saving へ の の ま ご you care about, ご third-ga ni wa ta Hiro Fan Tong し て っ て ki ta soak the results need to バ ラ
With し ン ス は せ て く see improvement を お ri します.
こ う を し status ta ta face riding ま え の に し need to see through the base づ ki, the tone needs to バ と し て が ラ ン ス
Maintain さ れ る こ と か ら, when the agency は, を project power "principle applied not Mika" と す る こ と し と い ま し ta
Ta.
お な, な 気 Sudden Departure of and so as 変 の よ に が electricity needs urgent 増 ri su ru possibility あ る い は, return to the past
Su ru 発 は じ め CLP を と し ta equipment ト ラ ブ Health も ル の 発 test ら れ る こ と え ら か, お さ ま に off
お か れ ま し て は, cited ki ki saving へ の 続 take group み を し て い 続 Ji ta da ki ma su う よ, お い い willing
Ta します. Million が one to want to be a force が さ れ る に は occasions, I know ら せ し お め on ta で, や む
Power project had ず を を す る こ と Mika facilities も あ ま す の で ri was, how death ご understanding, Mizuho ど ご の よ ろ third
し お く い い willing to ta します.
Ma ta, ta when the social と し い ま し て は, の project power "principle is not Mika facilities" を, お に い て Summer も Ji
す る こ と を 続 project that し て ま い ri します.
"We are locked in a battle. This is not a friendly, gentleman's discussion. It is a life and death conflict between the spiritual hosts of wickedness and those who claim the name of Jesus Christ."

"Search for the truth is the noblest occupation of man; its publication is a duty.”

Anne Louise Germaine de Stael (1766-1817), French author

“In times of universal deceit, telling the truth will be a revolutionary act.”

George Orwell

"I am the way, the truth, and the life."

Jesus Christ
Nosaj

User ID: 1304407
United States
04/13/2011 08:48 PM
Report Abusive Post
Report Copyright Violation
Re: SECRET WEAPONS PROGRAM INSIDE **FUKUSHIMA**
no takers?
 Quoting: Gardenzero


We are collectively thinking about the prospect.
 Quoting: TraderRob


bump
 Quoting: KBambi


yoda
Jus' movin' on up in the world inch by inch...





GLP