Message Subject California's Lake Oroville Main Spillway Severely Damaged/Eroded. Oroville Dam's Recently Reconstructed Main Spillway Fundamentally Flawed
Poster Handle Crunch62
Post Content
I'm about 15 miles downstream from the dam. CA DWR has been trying to maintain the elevation at around 850 feet (crest elevation is 900') for flood storage.

Even with the previous 50K CFS releases, the lake rose almost 10 feet in the past 24 hours. With the spillway shut down, it will rise even faster. Currently at 858 feet. 42 feet to go.

I'm having flashbacks to 1997, when they thought the dam was going to be overtopped by excessive inflow. It wasn't a fun time.
 Quoting: Crunch62


Stay safe man, be ready to bug out, Earthen dams have been know to slide when the reach peak levels. Even tho this site shows me from Canada, I'm in Red Bluff. The river here is WAY up. Expecting to peak in the morning. We still have some major storms coming, I feel for ya man.

We're pretty close to the river here, and it rose up about 10 ft. in the last day. They are doing some serious releases from Shasta right now too.

It's not looking good, they slowed it some, and the river went down about 15', but the rains came again this week, and now it's reclaimed all that and some.
 Quoting: Anonymous Coward 73740180


Living here for 30+ years, I have become very impressed by the engineering that went into the design and construction of this dam. The usage of local materials in the fill, the processed rock from the gold rush dredge tailings combined with the local clay soil, painstakingly combined and compacted.

It is an engineering marvel.

Then it was turned over to bureaucrats to manage. Shameful.
 