REPORT COPYRIGHT VIOLATION IN REPLY
|
Message Subject
|
D00M 0N. TOTAL LIQUIDATION of THE CCP - 3 Gorges Dam STRUCTURAL ISSUES + CRACKS** - China Supply Chain will be wiped off the Face of this Earth
|
Poster Handle
|
Anonymous Coward |
Post Content
|
...There's barely enough time right NOW to shutdown any downstream reactors... That should have been in progress many days ago... Quoting: AkashicRecord® Shutting down the reactors won't prevent meltdowns. Study it research it. Even if TEPCO had enough time to shutdown the FUKUSHIMA reactors it would not have prevented the meltdowns and crisis that it's today. Quoting: Anonymous Coward 77151514 excellent point Quoting: ProfessorWhistleTitz That is TOTAL BUNK. When shut down during a total power outage those reactors are designed to percolate the water through their systems and stay cool without any electricity at all. Add Stuxnet to the equation and all bets are off. What happened? All the valves on the reactors were closed and Stuxnet then put them at full output. They exploded. The exact same thing is planned for the United States if the bolsheviks are somehow denied a takeover, X100 Quoting: Anonymous Coward 77526934 Fukushima never lost offsite power either. It was RIGHT THERE, ON SITE, coming in from Tokyo. But miraculously, the switch gear would not engage to allow power in, EVEN AFTER IT WAS CHANGED OUT. Thank you stuxnet, and you know who that belongs to.
|
|
Please verify you're human:
|
|
Reason for copyright violation:
|